Loom Machine Operation
Weaving specification
Document Control
Document No..………………………………
Revision No.…………………………………
D.C. Signature.……………………………....
Date………………………………………….
A Denims Limited
Document No: 52-302
AUTHOR Md.Rafiqul Islam raTan
DOCUMENT OWNER
Approvals:
DOCUMENT OWNER
……………..
Head Of DOCUMENT Control ……….
JEON NASIR
A Denims Limited
AUTHOR: THE PERSON WHO WRITERS, PRODUCTS
CREATES, ORGANIZE OR REDESIGNS the document:
DOCUMENT OWNER: HEAD OF THE DEPARTMENT OF
THE PRIMARY DOCUMENT USER GROUP IS THE DOCUMENT OWNER. HE OS RESPONSOBLE FOR ENSURES THE
APPROPRIATENESS OF DOCUMENT AND GIVES APPROVAL UPON. COMPLETION
Doument
Editor
|
Date
|
Section
Edited
|
|
|
Corrections are made in
the section 2&4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table
of content
1.
Process Definition……………………………………………..
2.
Process requirement……………………………………………
3.
Equipment……………………………………………………...
4.
Key accessories…………………………………………………
5.
Materials/ chemical used……………………………………….
6.
Safety measures…………………………………………………
7.
Production procedure…………………………………………..
8.
Operation staff………………………………………………….
9.
Machine setup………………………………………………….
10.
Check list before production…………………………………
11.
Operation procedure…………………………………………
12.
The technical responsibility…………………………………
13.
Beam piecers responsibility…………………………………
14.
Operation responsibility……………………………………
15.
The shift officers/ in charge responsibility…………………
16.
Product quality check………………………………………
17.
Qc sample list ……………………………………………
18.
Response to equipment faults ……………………………
19.
Machine / area cleaning……………………………………
20.
Applicable forms / documents………………………………
21.
Forms and documents used………………………………
22.
Document flow……………………………………………
23.
Attachments ………………………………………………
AUTHOR: THE PERSON WHO WRITERS, PRODUCTS
CREATES, ORGANIZE OR REDESIGNS the document:
DOCUMENT
OWNER: HEAD OF THE DEPARTMENT OF
THE PRIMARY DOCUMENT USER GROUP IS THE DOCUMENT OWNER. HE OS RESPONSOBLE FOR ENSURES THE
APPROPRIATENESS OF DOCUMENT AND GIVES APPROVAL UPON. COMPLETION
1.0
Process Definition
Interlacement of two or more yarns/ thread
warp and weft yarns in A definite order to form A fabric which is suitable for
dress material domestic and industrial purpose is called weaving. The machine
use for this purpose is called weaving machine or loom.
2.0 Process Requirement
2.1 Equipment
The machine used for the purpose of weaving
can be categorized are as follows:
Model
|
Sheding Device
|
No. Of loom
|
Tsudakoma Air jet loom,
Japan ZA 2051
|
Cam
shedding
|
56
|
Sulzer ruti loom,
switerland 153n VSD110KR D1
|
Cam
shedding
|
12
|
2.2 Key Accessories
The
key accessories used for weaving are as follows:
v Weavers hook
v Weavers cutter
Pick counting glass
Measuring tape
2.3 Materials / chemicals used
Not Applicable
3.0 Safety Measures
In
order to ensure floor and personal safety, personal are instructed to follow
the safety guidelines given below:
v Smoking is strictly prohibited
in the factory premises.
v Operators are instructed not
to touch any rotating or operating parts until the machine comes into A
complete stop.
Weaving Process Rev: Page
v Do not operate the machine
in cloths/ yarn that could get entangled in the rotating parts,
v During maintenance turn All
the electrical switches into manual position all electric supply get cut off
and the machine stops.
v Put sign on the machine
(yellow-Weft, Green-warp,Red-mechanical)
As per requirement.
4.0 Production procedure
4.1 operation staff
Operation staffs for weaving
operation and their responsibilities are given below:
Operating Staff
|
Responsibilities
|
Section Head
|
In-charge of overall loom operations
|
Head of Technicians
|
Maintenance In charge
|
Production Officer
|
Shift In charge
|
Loom Technicians
|
Shift wise running loom
checking, setting,gauging.tuning etc
|
Beam piecer
|
Loading new beams on
machine and unloading empty beam from machines and pass the knotting beams
and machines that are ready for production.
|
Loom Operator
|
Operator run the machine
|
Weft supplier
|
Supply weft yarn and
remove yarn and clean waste box
|
Cleaner
|
Cleaner the machine and
department.
|
4.2 Machine setup
The
machine set up for weaving operating are given below:
Model
|
Weft insertion capacity
|
R.P.M
|
Tsudakoma Air jet Loom,
Japan ZA 2051
|
2
|
Up to 650
|
Sulzer Ruti projectile
loom, Switzerland 153 VSD 110 KR d1
|
4
|
Up to 220
|
4.3 Checklist
before production
Operator must check the following points prior
to operation:
Ø Check safety switch.
Ø Check drawing, denting,
frabic width, weft density and any other fabric defect.
Ø Check yarn count and
manufacturer.
Ø Check the quality card
(F52-302-05).
4.4 Operation procedure
After article is done, A new
weavers beam is set on the machine and drawing or trying id done. It is the
duty of the loom technician to check and set all necessary setting, gauging and
operating and operating values through mechanical means. After setting is done,
he hands over the machine to beam piecers /beam fitter. The beam piecer checks
the fabric for:
v Any wrong or broken design
v Any wrong drawing and
denting
v Fabric width , warp, weft
density
v Any other cloth defect
Any fault found in the fabric is correct over
the loom and then handed over to operators for normal running
For all types of fabric, the first meter of
fabric is sent to quality control Department for subsequent parameter test.
Upon getting quality approval from quality control department the operator
status the machine for bulk production. The quality approval sheet (F82-101-01)
is filed in the weaving department as A reference.
4.4.1 The Technicians Responsibility
4.4.1 The Technicians Responsibility
Following are the Responsibilities of A Loom
Technician:
v Depending upon yarn count, weave design and
sizing condition of the beam RPM of the loom is decided and set (if required).
v Based on quality, pick gear
is changed and Dobby card is set.
v Regular checking is also
carried out during operating and different parameters are fine-tuned as
required to achieve optimum loom running efficiency.
v Articles are changed as per
quality requirements
v All running maintenance
works are done in A shift.
4.4.2 Beam piecers Responsibility
At the completion of articles by maintenance
people, looms are handed over to the beam piecer Beam piecer should perform the
following tasks:
v Pass the knotting beam and
machine that are ready for production.
v Unload empty beam and load
weavers beam on the machine
v Visually cheek the fabic quality:
v Any wrong or broken design
v Any wrong drawing and
denting
v Fabric width , warp, weft
density
v Any other cloth defect.
4.4.3 The operators Responsibility
Following are the Responsibility of an Operator:
v To run the machine in the systematic way as
advised by the department head and
guided by the shift officers in –change and beams piecers
v T o repair or knot the broken warp and weft
yarn during operation in the quickest possible time so that the down time for
short stops ate minimized.
v To ensure and use the correct weft yarn, which
did weft supplier, publish.
v To cut long tails of knots of warp ends by
cutter to improve the quality of denim fabric.
v To produce defect –free
fabric that was occurred as A result of missing ends and pocks, wrong drawing
denting, miss selection of weft yarn.
4.4.4.
The shift officers –in charge responsibility
Following are the Responsibility of shift officers –in charge:
v Ensure all the activities of
the department are performed satisfactorily
v Take best effort to control
wastage
v Ensure optimum house keeping
v Check the attendance
v Encourage workers not to
indulge in any malpractice and motivate them for higher efficiency
v Make operation wise daily
production and shift efficiency
v Make A comprehensive
activity report of his shift in the log book (Log book No. L52-302-01)
4.5 Product Quality cheek
The first meter of the fabric is made and
checked visually for:
v Any wrong or broken design
v Any wrong drawing / denoting
fabric width, warp and weft density
v Any sorts of fabric defect
Any fault found in the fabric is corrected is
corrected over the loom and it is handed over the operator for production.
4.6 Sample
Test
For all types of fabrics, the first meter of
the fabric is send to Q.c department for subsequent tests and upon receiving
the quantity approval from Q.c. Department weaving machine is started for bulk
production. The quantity Approval sheet (F82-101-01) is filed in the weaving
section as A future reference.
4.7 Response to equipment faults:
Following are the responsible to be taken in
case of any equipment fault (s):
Equipment
faults:
|
Response
|
Mechanical problem
|
Call loom Mechanical
Maintenance
|
Electrical problem
|
Call loom Electrical
Maintenance
|
Utilities problem
|
Call Utilities department
|
4.8 Machine /Area clearing
All machines are cleaned with compressed air
in each shift.
The cleaners clean the floor with wiper in
every shift.
The loom Maintenance department performs the
precognitive maintenance task as per the PM schedule. Refer to loom Maintenance
Specification (Document No.30-201) for details.
5.0 Applicable forms /Documents.
5.1Forms and documents used
The necessary forms &
documents used for weaving process are listed below:
1.
Daily production Report (Form No.F52-302-01)
2.
Weaving program report ((Form No.F52-302-02)
3.
Daily Weaving Report (Form No.F52-302-03)
4.
Sizing beam requisition (Form No.F52-302-02)
5.
Greige sample washing record (Form No.F52-302-04)
6.
Quality card (Form No.F52-302-05)
7.
Fabric Transfer statement (Form No.F52-302-06)
8.
Wastage return statement (Form No.F52-302-07)
9.
Quality Approval sheet (Form No.F52-302-07)
10.
Weaving log book (log book no.L52-302-01)
5.2 Document Flow:
The document flow of the above document is as
follows:
The daily production report
(Form No.F52-302-01) is maintained to record details of per day shift wise
production. The concerned person fills it and the area in-charge verifies the
data mentioned on it.
The Weaving program report
((Form No.F52-302-02) is used to give detailed written instruction to the
operators.
The Daily Weaving Report (Form No.F52-302-03) shows the details of per
day shift wise production. It also includes the machine stoppage details.
Based on weaving plan, the required number of
sized beam is written down on the sizing beam requisition form Sizing beam
requisition (Form No.F52-302-02) by the planing weaving department. Beam
requisition form is sending to dying and sizing department as per quality.
11.
For all types of fabric, after producing the first meter of the fabric
of is sent to Q.C department for subsequent test. The Q.c fills out the greige
sample washing record (Form No.F52-302-04) and sends A copy to the weaving
section for further reference.
12.
The quality card (Form No.F52-302-05) is used to show loom wise quality
order to guide the operators to achieve desired quality.
The Fabric Transfer statement (Form No.F52-302-06)
is used to transferred the produced fabric the greige fabric stores. The
concerned person of weaving department prepares it and sign on it .The
concerned stores personal sign on it upon receiving the good as per this
statement.
The Wastage return statement (Form
No.F52-302-07) is used to transferred the wastage of the storage The concerned
person of weaving department prepares it and sign on it .The stores personal
sign on it upon receiving the good as per this statement
Q.c
department to specify the parameter test result and approval of the sample
based on this report uses the Quality Approval sheet (Form No.F52-302-07), the
operator goes for bulk production with necessary changes (if required).
Weaving log book (log book no. L52-302-01) to
keep detailed record of production. The concerned operator fills it in each
shifts the shift in –charge verifies the data and keep it for future reference.
5.3 Attachments
The forms used in this process are enclosed
herewith.
=========================================================
Weaving Process Rev: Page